03 Faculty of Business, Economics and Social Sciences > Department of Business Management > Institute of Financial Management > Professorship for Quantitative Methods in Business Administration

Up a level
Export as [feed] RSS
Group by: Date | Name | Item Type | Refereed | No Grouping
Jump to: 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | 2005 | 2004 | 2003 | 2002 | 2001 | 2000
Number of items at this level: 278.

2023

Bigler, T; Kammermann, M; Baumann, P (2023). A matheuristic for a customer assignment problem in direct marketing. European journal of operational research, 304(2), pp. 689-708. Elsevier 10.1016/j.ejor.2022.04.009

2022

Baumann, Philipp; Kammermann, Manuel Stanley; Elsaesser, Silvan (20 January 2022). Minimizing paper waste and setup costs in offset printing. In: IEEE International Conference on Industrial Engineering and Engineering Management (pp. 858-862). IEEE 10.1109/IEEM50564.2021.9673049

Baumann, Philipp (2022). A k-means algorithm for clustering with soft must-link and cannot-link constraints (Unpublished). In: International Conference on Pattern Recognition Applications and Methods. Virtual Conference. 3.-5. February 2022.

Baumann, Philipp (2022). An integer optimization-based approach to fair clustering (Unpublished). In: 32nd European Conference on Operational Research. Espoo. 3.-6. July 2022.

Bigler, Tamara (2022). A matheuristic for the obnoxious p-median problem (Unpublished). In: 32nd European Conference on Operational Research. Espoo. 3.-6. July 2022.

Bigler, Tamara (2022). A binary-linear programming-based matheuristic for the obnoxious p-median problem (Unpublished). In: INFORMS Annual Meeting. Indianapolis. 16.- 19. October 2022.

Baumann, Philipp (2022). FT-KMEANS: a fast algorithm for fault-tolerant facility location. In: Proceedings of the 2022 IEEE International Conference on Industrial Engineering and Engineering Management. 10.1109/IEEM55944.2022.9989850

Baumann, Philipp (2022). FT-KMEANS: a fast algorithm for fault-tolerant facility location (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Kuala Lumpur. 7.-10. December 2022.

Baumann, Philipp (2022). An integer programming-based algorithm for semi-supervised clustering (Unpublished). In: INFORMS Annual Meeting. Indianapolis. 16.-19. October 2022.

2021

Trautmann, Norbert (October 2021). A Continuous- time Linear Programming Formulation For Resource-constrained Project Scheduling With Multiple Sites (Unpublished). In: INFORMS Annual Meeting. Anaheim. 23.10.2021 - 27.10.2021.

Gnägi, Mario; Baumann, Philipp (2021). A matheuristic for large-scale capacitated clustering. Computers & operations research, 132, p. 105304. Elsevier 10.1016/j.cor.2021.105304

Baumann, Philipp (2021). Large-scale customer assignment in direct marketing (Unpublished). In: 31st Annual POMS Conference. Virtual Conference. 30. April-5. May 2021.

Baumann, Philipp (2021). A k-means algorithm for clustering with hard and soft must-link and cannot-link constraints (Unpublished). In: International Conference on Operations Research. Universität Bern (Virtual Conference). 31. August - 03. September 2021.

Baumann, Philipp (2021). Clustering with weighted must-link and cannot-link constraints (Unpublished). In: INFORMS Annual Meeting. Anaheim. 24.-27. October 2021.

Baumann, Philipp (2021). Minimizing paper waste and setup costs in offset printing (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Virtual Conference. 13.-16. December 2021.

Bigler, Tamara; Gnägi, Mario; Trautmann, Norbert (2021). A novel matheuristic for the multi-site resource-constrained project scheduling problem. In: 17th International Workshop on Project Management and Scheduling.

Bigler, Tamara (2021). A matheuristic approach for the multi-site resource-constrained project scheduling problem (Unpublished). In: 31st European Conference on Operational Research. Athens. 11.- 14. July 2021.

2020

Gnägi, Mario; Strub, Oliver (2020). Tracking and outperforming large stock-market indices. Omega, 90(101999), p. 101999. Elsevier 10.1016/j.omega.2018.11.008

Baumann, Philipp; Keupp, Marcus M. (2020). Assessing the Reliability of Street Networks: A Case Study Based on the Swiss Street Network. In: Keupp, Marcus Matthias (ed.) The Security of Critical Infrastructures: Risk, Resilience and Defense. International Series in Operations Research & Management Science: Vol. 288 (pp. 111-129). Springer 10.1007/978-3-030-41826-7_8

Baumann, Philipp (2020). A binary linear programming-based k-means algorithm for clustering with must-link and cannot-link constraints. In: 2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (pp. 324-328). IEEE 10.1109/IEEM45057.2020.9309775

Schöni, C.; Baumann, P.; Trautmann, N. (2020). An order-first split-second approach to a novel variant of the cardinality-constrained covering traveling salesperson problem. In: 2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (pp. 615-619). IEEE 10.1109/IEEM45057.2020.9309753

Baumann, Philipp (2020). A binary linear programming-based k-means algorithm for clustering with must-link and cannot-link constraints. (Unpublished). In: IEEM International Conference on Industrial Engineering and Engineering Management (IEEM). Virtual Conference. 14.-17. December 2020.

Schöni, Chantal Jacqueline (2020). An order-first split-second approach to a novel variant of the cardinality-constrained covering traveling salesperson problem (Unpublished). In: 2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). 14-17 Dec 2020.

2019

Bigler, Tamara; Baumann, Philipp; Kammermann, Manuel (16 December 2019). Optimizing Customer Assignments to Direct Marketing Activities: A Binary Linear Programming Formulation. In: IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). Macau. 15.-18.12.2019.

Baumann, Philipp (16 December 2019). A Binary Linear Programming-Based K-Means Approach for the Capacitated Centered Clustering Problem. In: IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). Macau. 15.-18.12.2019.

Gnägi, Mario; Trautmann, Norbert (16 December 2019). A Continuous-Time Mixed-Binary Linear Programming Formulation for the Multi-Site Resource-Constrained Project Scheduling Problem. In: IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).. Macau. 15.-18.12.2019.

Lerch, Dennis; Trautmann, Norbert (16 December 2019). A Lazy-Constraints Approach to Resource-Constrained Project Scheduling. In: IEEEInternational Conference on Industrial Engineering and Engineering Management (IEEM). Macau. 15.-18.12.2019.

Gnägi, Mario (23 October 2019). A matheuristic for large-scale capacitated clustering (Unpublished). In: INFORMS Annual Meeting. Seattle, WA. 20.-23. October 2019.

Gnägi, Mario (23 October 2019). A novel continuous-time mixed-binary linear programming formulation for the multi-site resource-constrained project scheduling problem (Unpublished). In: INFORMS Annual Meeting. Seattle, WA. 20.-23. October 2019.

Strub, Oliver (23 October 2019). A matheuristic to build linear regression models for binary classification (Unpublished). In: INFORMS Annual Meeting. Seattle, WA. 20.-23. October 2019.

Trautmann, Norbert (21 October 2019). An order-first split-second approach to an application of the multiple traveling salesman problem (Unpublished). In: INFORMS Annual Meeting. Seattle, WA. 20.-23. October 2019.

Strub, Oliver; Brandinu, Stefano; Lerch, Dennis Julian; Schaller, Jürgen; Trautmann, Norbert (2019). A Three-phase Approach to an Enhanced Index-tracking Problem with Real-life Constraints. The engineering economist, 64(3), pp. 227-253. Taylor & Francis 10.1080/0013791X.2019.1619887

Baumann, Philipp (23 June 2019). Comparing two new combinatorial optimization algorithms to leading machine learning techniques (Unpublished). In: European Conference on Operational Research. Dublin. 23.-26.06.2019.

Trautmann, Norbert (23 June 2019). A MILP formulation for the Multi-Mode ResourceConstrained Project Scheduling Problem MRCPSP (Unpublished). In: European Conference on Operational Research. Dublin. 23.-26.06.2019.

Baumann, Philipp (17 May 2019). Comparing two new combinatorial optimization algorithms for binary classification to leading machine learning techniques (Unpublished). In: Colloquia of the Department of Mathematical Statistics and Actuarial Sciences of the University of Bern. Bern. 17.04. 2019.

Trautmann, Norbert (5 May 2019). A MILP Formulation for the Multi-Mode Resource-Constrained Project Scheduling Problem MRCPSP (Unpublished). In: 30th Annual POMS Conference. Washington D.C.. 2.-6.05. 2019.

Baumann, Philipp (3 May 2019). Optimal Customer Selection for Direct Marketing Campaigns (Unpublished). In: 30th Annual POMS Conference. Washington D.C.. 2.-6.05. 2019.

Gnägi, Mario; Rihm, Tom; Zimmermann, Adrian; Trautmann, Norbert (2019). Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem. Computers & industrial engineering, 129, pp. 346-353. Elsevier 10.1016/j.cie.2019.01.033

Baumann, Philipp; Hochbaum, D.S.; Yang, Y.T. (2019). A comparative study of the leading machine learning techniques and two new optimization algorithms. European journal of operational research, 272(3), pp. 1041-1057. Elsevier 10.1016/j.ejor.2018.07.009

Strub, Oliver; Trautmann, Norbert (2019). A two-stage approach to the UCITS-constrained index-tracking problem. Computers & operations research, 103, pp. 167-183. Elsevier 10.1016/j.cor.2018.10.002

Bigler, Tamara (2019). A binary linear programming model for assigning customers to direct marketing activities of a telecommunications provider (Unpublished). In: Manufacturing and Service Operations Management. Singapore. 30. June - 02. July 2019.

2018

Baumann, Philipp (19 December 2018). A matheuristic for a real-world variant of the multiple traveling salesman problem. In: IEEM 2018: IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok. 16.12-19.12.2018.

Gnägi, Mario; Zimmermann, Adrian; Trautmann, Norbert (19 December 2018). A continuous-time unit-based MILP formulation for the resource-constrained project scheduling problem. In: IEEM 2018: IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok. 16.-19.12.2018.

Baumann, Philipp (19 December 2018). A matheuristic for a real-world variant of the multiple traveling salesman problem (Unpublished). In: IEEM International Conference on Industrial Engineering and Engineering Management 2018. Bangkok. 16.-19. Dezember 2018.

Trautmann, Norbert; Gnägi, Mario (19 December 2018). A continuous-time unit-based MILP formulation for the resource-constrained project scheduling problem (Unpublished). In: IEEM International Conference on Industrial Engineering and Engineering Management 2018. Bangkok. 16.-19. Dezember 2018.

Gnägi, Mario; Rihm, Tom; Trautmann, Norbert (17 December 2018). A continuous-time MILP formulation for the multi-mode resource-constrained project scheduling problem. In: IEEM 2018: IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok. 16.-19.12.2018.

Bigler, Tamara; Strub, Oliver (17 December 2018). A Local-branching heuristic for the best subset selection problem in linear regression. In: IEEM 2018: IEEE International Conference on Industrial Engineering and Engineering Management. Bangkok. 16.-19.12.2018.

Strub, Oliver (17 December 2018). A Local-branching heuristic for the best subset selection problem in linear regression (Unpublished). In: IEEM International Conference on Industrial Engineering and Engineering Management 2018. Bangkok. 16.-19.12. 2018.

Baumann, Philipp (8 July 2018). Scaling up similarity-based machine learning models: New geometric algorithms for sparse computation. (Unpublished). In: 29th European Conference on Operational Research. Valencia. 8.-11. July.

Trautmann, Norbert (5 May 2018). A Novel Continuous-Time Assignment-Based MILP Formulation for the Resource-Constrained Project Scheduling Problem RCPSP (Unpublished). In: 29th Annual POMS Conference. Houston. 04.-07.05.2018.

Baumann, Philipp (5 May 2018). A Matheuristic for a Multi-Period Home Care Routing and Scheduling Problem (Unpublished). In: 29th Annual POMS Conference. Houston. 04.-07.05.2018.

Strub, Oliver (4 May 2018). A Matheuristic for the Best Subset Selection Problem in Linear Regression (Unpublished). In: 29th Annual POMS Conference. Houston. 04.-07.05.2018.

Trautmann, Norbert; Rihm, Tom; Saner, Nadine Josephine; Zimmermann, Adrian (17 April 2018). A continuous-time assignment-based MILP formulation for the resource-constrained project scheduling problem. Proceedings of the 16th International Conference on Project Management and Scheduling, pp. 242-245.

Strub, Oliver; Baumann, Philipp (2018). Optimal construction and rebalancing of index-tracking portfolios. European journal of operational research, 264(1), pp. 370-387. Elsevier 10.1016/j.ejor.2017.06.055

Rihm, Tom; Trautmann, Norbert; Zimmermann, Adrian (2018). MIP formulations for an application of project scheduling in human resource management. Flexible Services and Manufacturing Journal, 30(4), pp. 609-639. Springer 10.1007/s10696-016-9260-8

Rihm, Tom; Baumann, Philipp (2018). Staff assignment with lexicographically ordered acceptance levels. Journal of scheduling, 21(2), pp. 167-189. Springer 10.1007/s10951-017-0525-1

Zimmermann, Adrian; Trautmann, Norbert (2018). A list-scheduling heuristic for the short-term planning of assessment centers. Journal of scheduling, 21(2), pp. 131-142. Springer US; http://www.springer-ny.com 10.1007/s10951-017-0521-5

Strub, Oliver (2018). Optimization of Index-Based Portfolios. (Dissertation, Universität Bern, Wirtschafts- und Sozialwissenschaftliche Fakultät)

2017

Baumann, Philipp; Hochbaum, Dorit S.; Spaen, Quico (11 December 2017). High-performance geometric algorithms for sparse computation in big data analytics. In: Proceedings of the 2017 IEEE International Conference on Big Data. Boston. 11.-14.12.2017. 10.1109/BigData.2017.8257970

Gnägi, Mario; Baumann, Philipp (10 December 2017). Large-scale clustering using mathematical programming. In: Proceeding of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 10.-13. Dezember. 10.1109/IEEM.2017.8289999

Baumann, Philipp (10 December 2017). Optimal staff assignment and routing in personalized home care. In: Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 10.-13.12.2017. 10.1109/IEEM.2017.8290048

Rihm, Tom; Trautmann, Norbert (10 December 2017). An assignment-based continuous-time MILP model for the resource-constrained project scheduling problem. In: Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 10.-13.12.2017. 10.1109/IEEM.2017.8289846

Strub, Oliver (10 December 2017). A new MILP formulation for rebalancing enhanced index-tracking portfolios. In: Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 10.-13.12.2017. 10.1109/IEEM.2017.8290040

Strub, Oliver (22 October 2017). A hybrid approach to the 1/n portfolio tracking problem (Unpublished). In: INFORMS Annual Meeting. Houston/Texas. 22.-25.10.2017.

Trautmann, Norbert (22 October 2017). A mixed-integer linear programming formulation of the RCPSP based on explicit assignment and sequencing decisions (Unpublished). In: INFORMS Annual Meeting. Houston. 22.-25.10.2017.

Trautmann, Norbert (6 September 2017). A novel mixed-integer linear programming formulation for the resource-constrained project scheduling problem (Unpublished). In: OR 2017 International Conference on Operations Research. Berlin. 6.-8.09.2017.

Strub, Oliver (29 June 2017). A genetic algorithm to construct index-tracking portfolios subject to the UCITS III concentration rule (Unpublished). In: 15th Swiss Operations Research Days. Fribourg. 29.-30.06.2017.

Rihm, Tom (29 June 2017). A mathematical programming approach for computing the pathwidth of graphs (Unpublished). In: 15th Swiss Operations Research Days. Fribourg. 29.-30.06.2017.

Baumann, Philipp (29 June 2017). Scaling up data mining techniques (Unpublished). In: 15th Swiss Operations Research Days. Fribourg. 29.-30.06.2017.

Rihm, Tom (23 June 2017). Minimizing operational costs of assessment centers (Unpublished). In: International Symposium on Scheduling 2017. Nagoya, Japan. 23.-25.06.2017.

Trautmann, Norbert (23 June 2017). An assignment- and sequencing-based mixed-integer linear programming formulation for the resource-constrained project scheduling problem (Unpublished). In: International Symposium on Scheduling 2017. Nagoya, Japan. 23.-25.06.2017.

Rihm, Tom; Trautmann, Norbert (23 June 2017). An assignment- and sequencing-based mixed-integer linear programming formulation for the resource-constrained project scheduling problem. In: Proceedings of the International Symposium on Scheduling 2017. Nagoya, Japan. 23.-25.06.2017.

Rihm, Tom (23 June 2017). Minimizing operational costs of assessment centers. In: International Symposium on Scheduling. Proceedings. Nagoya, Japan. 23.-25.06.2017.

Strub, Oliver (7 June 2017). A genetic algorithm for the UCITS-constrained index-tracking problem (Unpublished). In: IEEE Congress on Evolutionary Computation. San Sebastián. 05.-08.06.2017.

Strub, Oliver; Trautmann, Norbert (7 June 2017). A genetic algorithm for the UCITS-constrained index-tracking problem. In: Proceedings of the 2017 IEEE Congress on Evolutionary Computation. San Sebastián, Spain. 5.-8.6.2017. 10.1109/CEC.2017.7969394

Trautmann, Norbert (May 2017). An RCPSP-Based Heuristic for the Short-Term Planning of Assessment Centers (Unpublished). In: 28th Annual POMS Conference. Seattle. 05.-08.05.2017.

Baumann, Philipp (May 2017). Segmentation of Medical Images Using Mathematical Programming (Unpublished). In: 28th Annual POMS Conference. Seattle. 05.-08.05.2017.

Rihm, Tom (May 2017). A Greedy Heuristic for Artisan Ice Cream Production Scheduling (Unpublished). In: 28th Annual POMS Conference. Seattle. 05.-08.05.2017.

Rihm, Tom; Trautmann, Norbert (2017). A decomposition heuristic for short-term planning of assessment centres. European journal of industrial engineering, 11(6), pp. 725-751. Inderscience Publishers 10.1504/EJIE.2017.10006711

Zimmermann, Adrian (2017). A mixed-integer programming-based heuristic for project scheduling with work-content constraints. European journal of industrial engineering, 11(6), pp. 752-773. Inderscience Publishers 10.1504/EJIE.2017.10006712

Rihm, Tom (2017). Applications of Mathematical Programming in Personnel Scheduling. (Dissertation, Universität Bern, Wirtschafts- und Sozialwissenschaftliche Fakultät)

2016

Baumann, Philipp (December 2016). Sparse-reduced computation for large-scale spectral clustering. In: 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (pp. 1284-1288). IEEE 10.1109/IEEM.2016.7798085

Trautmann, Norbert; Gnägi, Mario (December 2016). An implementation of the parallel schedule-generation scheme for applying Microsoft Excel's Evolutionary Solver to the resource-constrained project scheduling problem RCPSP. In: 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (pp. 35-39). IEEE 10.1109/IEEM.2016.7797831

Baumann, Philipp (December 2016). Sparse-reduced computation for large-scale spectral clustering (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Bali. 4.12.-7.12.2016.

Strub, Oliver (December 2016). An application of Microsoft Excel’s evolutionary solver based on a novel chromosome encoding scheme to the 1/N portfolio tracking problem (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Bali. 4.12.-7.12.2016.

Zimmermann, Adrian (December 2016). An MIP-based heuristic for scheduling projects with work-content constraints (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Bali. 04.12.-07.12.2016.

Trautmann, Norbert (December 2016). An implementation of the parallel schedule-generation scheme for applying Microsoft Excel’s evolutionary solver to the resource-constrained project scheduling problem RCPSP (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Bali. 4.12.-7.12.2016.

Strub, Oliver (November 2016). Optimal construction and rebalancing of index-tracking portfolios. In: INFORMS Annual Meeting. Nashville. 13.-16.11.2016.

Rihm, Tom (November 2016). Facets and valid inequalities for the pathwidth problem. In: INFORMS Annual Meeting. Nashville. 13.-16.11.2016.

Trautmann, Norbert (November 2016). Microsoft Excel evolutionary solver and resource constrained project scheduling. In: INFORMS Annual Meeting. Nashville. 13.-16.11.2016.

Correa Shokiche, Carlos Enrique; Baumann, Philipp; Hlushchuk, Ruslan; Djonov, Valentin; Reyes, Mauricio (17 October 2016). High-Throughput Glomeruli Analysis of micro-CT Kidney Images Using Tree Priors and Scalable Sparse Computation. In: International Conference on Medical Image Computing and Computer-Assisted Intervention. Lecture Notes in Computer Science: Vol. 9901 (pp. 370-378). Cham: Springer International Publishing 10.1007/978-3-319-46723-8_43

Rihm, Tom (September 2016). Operational planning of assessment centers: Matheuristic and performance analysis (Unpublished). In: 14th Swiss Operations Research Days. Lugano. 08.-09.09.2016.

Zimmermann, Adrian (September 2016). An MIP-based heuristic for scheduling projects with work-content constraints (Unpublished). In: 14th Swiss Operations Research Days. Lugano. 08.-09.09.2016.

Trautmann, Norbert (August 2016). A hybrid approach for tracking the 1/N portfolio (Unpublished). In: 5th International Conference on Continuous Optimization. Tokyo. 06.-11.08.2016.

Trautmann, Norbert (August 2016). An application of Microsoft Excel’s Evolutionary Solver to the RCPSP (Unpublished). In: International Conference on Operations Research. Hamburg. 30.08.-02.09.2016.

Rihm, Tom (6 July 2016). A matheuristic for short-term planning of assessment centers (Unpublished). In: 28th European Conference on Operational Research. Poznan. 03.-06. Juli 2016.

Strub, Oliver (3 July 2016). A hybrid approach combining iterated greedy heuristics and quadratic programming to track the 1/N portfolio (Unpublished). In: 28th European Conference on Operational Research. Poznan. 03.-06.07.2016.

Rihm, Tom (May 2016). Planning assessment centers: An MIP-based decomposition heuristic (Unpublished). In: 27th Annual POMS Conference. Orlando. 06.-09.05.2016.

Trautmann, Norbert (May 2016). Resource-constrained project scheduling using Microsoft Excel's evolutionary solver (Unpublished). In: 27th Annual POMS Conference. Orlando. 06.-09.05.2016.

Rihm, Tom (April 2016). A decomposition heuristic for an assessment center planning problem (Unpublished). In: 15th International Conference on Project Management and Scheduling. Valencia. 19.-22.04.2016.

Trautmann, Norbert (April 2016). Microsoft Excel’s Evolutionary Solver and the Resource-Constrained Project Scheduling Problem RCPSP: Solution Approach and Performance Analysis (Unpublished). In: 15th International Conference on Project Management and Scheduling. Valencia. 19.-22.04.2016.

Baumann, Philipp (February 2016). Sparse-reduced computation: enabling mining of massively-large data sets (Unpublished). In: 5th International Conference on Pattern Recognition Applications and Methods. Rome. 24.-26.02.2016.

Strub, Oliver (February 2016). An iterated greedy heuristic for the 1/N portfolio tracking problem (Unpublished). In: 5th International Conference on Operations Research and Enterprise Systems. Rome. 23.-25.02.2016.

Strub, Oliver; Trautmann, Norbert (February 2016). An iterated greedy heuristic for the 1/N portfolio tracking problem. In: Proceedings of the 5th International Conference on Operations Research and Enterprise Systems. Rome. 23.-25.02.2016.

Baumann, Philipp; Trautmann, Norbert (2016). A note on the selection of priority rules in software packages for project management. Flexible Services and Manufacturing Journal, 28(4), pp. 694-702. Springer 10.1007/s10696-016-9236-8

Baumann, Philipp; Hochbaum, D.S.; Spaen, Q. (2016). Sparse-reduced computation: enabling mining of massively-large data sets. In: 5th International Conference on Pattern Recognition Applications and Methods. Rome. 24.-26.02.2016.

Rihm, Tom; Trautmann, Norbert (2016). A decomposition heuristic for an assessment center planning problem (Unpublished). In: Proceedings of the 15th International Conference on Project Management and Scheduling. Valencia. 19.-22.04. 2016.

Gnägi, Mario; Trautmann, Norbert (2016). Microsoft Excel’s Evolutionary Solver and the Resource-Constrained Project Scheduling Problem RCPSP: Solution Approach and Performance Analysis (Unpublished). In: Proceedings of the 15th International Conference on Project Management and Scheduling. Valencia. 19.-22.04.2016.

Hochbaum, Dorit S.; Baumann, Philipp (2016). Sparse computation for large-scale data mining. IEEE Transactions on Big Data, 2(2), pp. 151-174. Institute of Electrical and Electronics Engineers 10.1109/TBDATA.2016.2576470

Strub, Oliver; Trautmann, Norbert (2016). An application of Microsoft Excel's evolutionary solver based on a novel chromosome encoding scheme to the 1/N portfolio tracking problem. In: 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (pp. 745-749). IEEE 10.1109/IEEM.2016.7797975

Zimmermann, Adrian (2016). An MIP-based heuristic for scheduling projects with work-content constraints. In: 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (pp. 1195-1199). IEEE 10.1109/IEEM.2016.7798067

Zimmermann, Adrian (2016). Applications of Resource-Constrained Project Scheduling in Service Operations Management. (Dissertation, Universität Bern, Wirtschafts- und Sozialwissenschaftliche Fakultät)

2015

Strub, Oliver; Baumann, Philipp (December 2015). Index Tracking Using Data-Mining Techniques and Mixed-Binary Linear Programming. Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, pp. 1208-1212. Singapore: IEEE 10.1109/IEEM.2015.7385839

Rihm, Tom; Baumann, Philipp (December 2015). Improving Fairness in Staff Assignment: An Approach for Lexicographic Goal Programming. Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, pp. 1247-1251. Singapore: IEEE 10.1109/IEEM.2015.7385847

Trautmann, Norbert; Gnägi, Mario (December 2015). On an Application of Microsoft Excel’s Evolutionary Solver to the Resource-Constrained Project Scheduling Problem RCPSP. Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, pp. 646-650. Singapore: IEEE 10.1109/IEEM.2015.7385727

Strub, Oliver (December 2015). Index Tracking Using Data-Mining Techniques and Mixed-Binary Linear Programming (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 06.-09.12.2015.

Baumann, Philipp (December 2015). Efficient Deployment of Mobile Detectors for Security Applications (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 06.-09.12.2015.

Rihm, Tom (December 2015). Improving Fairness in Staff Assignment: An Approach for Lexicographic Goal Programming (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 06.-09.12.2015.

Trautmann, Norbert (December 2015). On an Application of Microsoft Excel’s Evolutionary Solver to the Resource-Constrained Project Scheduling Problem RCPSP (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 06.-09.12.2015.

Baumann, Philipp; Cooper, Reynold J.; Hochbaum, Dorit S.; Patel, Nidhi; Shalia, Kunal (December 2015). Efficient Deployment of Mobile Detectors for Security Applications. Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, pp. 214-218. Singapore: IEEE 10.1109/IEEM.2015.7385639

Rihm, Tom (September 2015). An MILP-based heuristic for staff scheduling problems with acceptance levels (Unpublished). In: International Conference on Operations Research. Vienna. 01.-04.09.2015.

Strub, Oliver (September 2015). Tracking the 1/N Portfolio (Unpublished). In: International Conference on Operations Research. Vienna. 01.-04.09.2015.

Zimmermann, Adrian (September 2015). Efficient list-generation techniques for scheduling assessment centers (Unpublished). In: International Conference on Operations Research. Vienna. 01.-04.09.2015.

Trautmann, Norbert (August 2015). MILP Formulations for Order Splitting on a Multi-slot Machine in the Printing Industry (Unpublished). In: International Congress on Industrial and Applied Mathematics. Beijing, China. 10.-14.08.2015.

Zimmermann, Adrian; Trautmann, Norbert (August 2015). A list-scheduling approach for the planning of assessment centers. Proceedings of the 7th Multidisciplinary International Conference on Scheduling: Theory and Applications, pp. 541-554.

Rihm, Tom (August 2015). A lexicographic goal programming approach for staff assignment with acceptance levels (Unpublished). In: Multidisciplinary International Conference on Scheduling: Theory and Applications. Prague. 25.-28.08.2015.

Zimmermann, Adrian (August 2015). A list-scheduling approach for the planning of assessment centers (Unpublished). In: Multidisciplinary International Conference on Scheduling: Theory and Applications. Prague. 25.-28.08.2015.

Trautmann, Norbert (June 2015). Optimal Order Splitting on a Multi-Slot Machine in the Printing Industry (Unpublished). In: CORS/INFORMS 2015 Joint International Meeting. Montreal. 14.-17.06.2015.

Trautmann, Norbert (May 2015). Order splitting on a multi-slot machine in the printing industry (Unpublished). In: 12th International Conference on Computational Management Science. Prague. 27.-29.05.2015.

Strub, Oliver (May 2015). Index tracking using unsupervised learning and mixed-binary convex programming (Unpublished). In: 12th International Conference on Computational Management Science. Prague. 27.-29.05.2015.

Zimmermann, Adrian (May 2015). A heuristic approach for scheduling assessment centers (Unpublished). In: 13th Swiss Operations Research Days. 07.-08.05.2015. Zurich.

Rihm, Tom (January 2015). An integer goal programming approach for a real-world employee scheduling problem (Unpublished). In: Programme Doctoral en Recherche Opérationnelle. Zinal. 11.-15.01.2015.

Baumann, Philipp; Forrer, Salome; Trautmann, Norbert (2015). Planning of a make-to-order production process in the printing industry. Flexible Services and Manufacturing Journal, 27(4), pp. 534-560. Springer 10.1007/s10696-014-9203-1

Baumann, Philipp; Trautmann, Norbert (2015). Resource-Constrained Project Scheduling with Project Management Information Systems. In: Schwindt, Christoph; Zimmermann, Jürgen (eds.) Handbook on Project Management and Scheduling. International Handbooks on Information Systems: Vol. 2 (pp. 1385-1400). Springer International Publishing 10.1007/978-3-319-05915-0_32

Baumann, Philipp; Fündeling, Cord-Ulrich; Trautmann, Norbert (2015). The Resource-Constrained Project Scheduling Problem with Work-Content Constraints. In: Schwindt, Christoph; Zimmermann, Jürgen (eds.) Handbook on Project Management and Scheduling. International Handbooks on Information Systems: Vol. 1 (pp. 533-544). Cham: Springer International Publishing 10.1007/978-3-319-05443-8_24

Rihm, Tom; Baumann, Philipp (2015). A lexicographic goal programming approach for staff assignment with acceptance levels. In: Proceedings of the 7th Multidisciplinary International Conference on Scheduling: Theory and Applications. Prague.

2014

Baumann, Philipp; Trautmann, Norbert (December 2014). Efficient symmetry-breaking formulations for grouping customer orders in a printing shop. In: Proceedings of the 2014 IEEE International Conference on Industrial Engineering and Engineering Management. Malaysia.

Baumann, Philipp; Trautmann, Norbert (December 2014). Efficient symmetry-breaking formulations for grouping customer orders in a printing shop (Unpublished). In: 2014 IEEE International Conference on Industrial Engineering and Engineering Management. Malaysia. 09.12.-12.12.2014.

Forrer, Salome (November 2014). Optimal Order Splitting on a Multi-slot Machine in the Printing Industry (Unpublished). In: INFORMS Annual Meeting. San Francisco. 09.-12.11.2014.

Strub, Oliver (November 2014). Construction of Index-Tracking Portfolios using Data Mining and Linear Programming (Unpublished). In: INFORMS Annual Meeting. San Francisco. 09.-12.11.2014.

Rihm, Tom (September 2014). An MILP-based heuristic for the capital-constrained net present value problem (Unpublished). In: International Conference on Operations Research 2014. Aachen. 02.-05.09.2014.

Baumann, Philipp; Trautmann, Norbert (2014). A hybrid method for large-scale short-term scheduling of make-and-pack production processes. European journal of operational research, 236(2), pp. 718-735. Elsevier 10.1016/j.ejor.2013.12.040

Trautmann, Norbert (May 2014). Project scheduling with work-content-constraints (Unpublished). In: POMS 25th Annual Conference. Atlanta. 09.-12.05.2014.

Baumann, Philipp (May 2014). Efficient binary classification of large data sets (Unpublished). In: POMS 25th Annual Conference. Atlanta. 09.-12.05.2014.

Trautmann, Norbert (January 2014). An application of combinatorial optimization in the printing industry (Unpublished). In: Industrial Engineering & Operations Research Colloquium. Berkeley. 30.01.2014.

Zimmermann, Adrian (January 2014). Operational planning of assessment centers (Unpublished). In: Programme Doctoral en Recherche Opérationelle. Zinal. 12.-16.01.2014.

Zimmermann, Adrian; Trautmann, Norbert (2014). Scheduling of assessment centers: an application of resource-constrained project scheduling. In: Fliedner, Thomas; Kolisch, Rainer; Naber, Anulark (eds.) Proceedings of the 14th International Conference on Project Management and Scheduling (pp. 263-266). TUM School of Management

Baumann, Philipp; Trautmann, Norbert (2014). An MILP formulation for scheduling of work-content-constrained projects. In: Fliedner, Thomas; Kolisch, Rainer; Naber, Anulark (eds.) Proceedings of the 14th International Conference on Project Management and Scheduling (pp. 24-27). TUM School of Management

Rihm, Tom; Trautmann, Norbert (2014). A MIP-based decomposition heuristic for resource-constrained project scheduling. In: Fliedner, Thomas; Kolisch, Rainer; Naber, Anulark (eds.) Proceedings of the 14th International Conference on Project Management and Scheduling (pp. 193-196). TUM School of Management

Grüter, Joëlle Nathalie; Trautmann, Norbert; Zimmermann, Adrian (2014). An MBLP model for scheduling assessment centers. In: Huisman, Dennis; Louwerse, Ilse; Wagelmans, Albert P.M. (eds.) Operations Research Proceedings 2013 (pp. 161-167). Cham: Springer International Publishing 10.1007/978-3-319-07001-8_22

Baumann, Philipp (2014). Efficient symmetry-breaking formulations for grouping customer orders in a printing shop (Unpublished). In: Programme Doctoral en Recherche Opérationelle. Zinal. 31.08.-03.09.2014.

Baumann, Philipp (2014). Sparse computation for large-scale binary classification (Unpublished). In: IFORS 2014 : 20th Conference of the International Federation of Operational Research Societies. Barcelona. 13.-18.07.2014.

Baumann, Philipp (2014). Portfolio-optimization models for small investors. In: Center for Risk Management Research Seminar. Berkeley. 28.01.2014.

Rihm, Tom (2014). A MIP-based decomposition heuristic for resource-constrained project scheduling (Unpublished). In: 14th International Conference on Project Management and Scheduling. München. 30.03.-02.04 2014.

Baumann, Philipp (2014). An MILP formulation for scheduling of work-content-constrained projects (Unpublished). In: 14th International Conference on Project Management and Scheduling. München. 30.03.-02.04.2014.

Zimmermann, Adrian (2014). Scheduling of assessment centers: an application of resource-constrained project scheduling (Unpublished). In: 14th International Conference on Project Management and Scheduling. München. 30.03.-02.04.2014.

Brandinu, Gianluca; Trautmann, Norbert (2014). A mixed-integer linear programming approach to the optimization of event-bus schedules: a scheduling application in the tourism sector. Journal of scheduling, 17(6), pp. 621-629. Springer 10.1007/s10951-014-0375-z

2013

Baumann, Philipp; Trautmann, Norbert (December 2013). Optimal Scheduling of Work-Content-Constrained Projects (Unpublished). In: 2013 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). Bangkok. 10.-13.12.2013.

Trautmann, Norbert (December 2013). Perspectives, experience and visions of academic-industry collaboration in operations research (Unpublished). In: 2013 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). Bangkok. 10.-13.12.2013.

Trautmann, Norbert (October 2013). An MILP formulation for work-content defined project scheduling (Unpublished). In: 43rd International Conference on Computers & Industrial Engineering. Hong Kong. 16.-18.10.2013.

Baumann, Philipp; Trautmann, Norbert (2013). Portfolio-optimization models for small investors. MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 77(3), pp. 345-356. Springer Berlin Heidelberg 10.1007/s00186-012-0408-3

Baumann, Philipp; Trautmann, Norbert (2013). A continuous-time MILP model for short-term scheduling of make-and-pack production processes. International journal of production research, 51(6), pp. 1707-1727. Taylor & Francis 10.1080/00207543.2012.694489

Baumann, Philipp; Trautmann, Norbert (2013). Optimal Scheduling of Work-Content-Constrained Projects (Unpublished). In: Proceedings of the 2013 IEEE International Conference on Industrial Engineering and Engineering Management.

Baumann, Philipp (2013). User influence on resource allocation with project management software (Unpublished). In: 43rd International Conference on Computers and Industrial Engineering. Hong Kong. 16.10.-18.10.2013.

Zimmermann, Adrian (2013). An MBLP model for scheduling assessment centers. In: International Conference Operations Research 2013. Rotterdam. 03.09.-06.09.2013.

Trautmann, Norbert (2013). Resource allocation for a make-to-order production process in the printing industry (Unpublished). In: International Conference Operations Research 2013. Rotterdam. 03.09.-06.09.2013.

Baumann, Philipp (2013). Short-term scheduling of make-and-pack production processes: a hybrid method for large-scale instances (Unpublished). In: 26th European Conference on Operational Research. Rome. 01.07.-04.07.2013.

Trautmann, Norbert (2013). Planning of a batch production process in the printing industry (Unpublished). In: 26th European Conference on Operational Research. Rome. 01.07.-04.07.2013.

Trautmann, Norbert (2013). A hybrid approach to large-scale scheduling of make-and-pack production processes (Unpublished). In: 55th CORS Annual Conference. Vancouver. 27.05.-29.05.2013.

Baumann, Philipp (2013). A hybrid heuristic for operations scheduling of make-and-pack production processes (Unpublished). In: 24th Annual POMS Conference. Denver. 03.05.-06.05.2013.

Trautmann, Norbert (2013). Planning of a continuous production process in the printing industry (Unpublished). In: 24th Annual POMS Conference. Denver. 03.05.-06.05.2013.

Baumann, Philipp (2013). Planning of a make-to-order printing process: MBLP formulation and matching-based savings heuristic (Unpublished). In: 55th CORS Annual Conference. Vancouver. 27.05.-29.05.2013.

2012

Baumann, Philipp; Trautmann, Norbert (2012). Operations scheduling in make-and-pack production: schedule construction and GA-based priority-rule generation procedures. In: Kwong, S.; Ng, S.; Jiao, R.; Xie, M. (eds.) Proceedings of the 2012 IEEE International Conference on Industrial Engineering and Engineering Management (pp. 454-458). IEEE

Brandinu, Gianluca; Trautmann, Norbert (2012). An integer-programming approach to benefit-maximal selection and scheduling of resource-constrained projects. In: Proceedings of the 2012 IEEE International Conference on Industrial Engineering and Engineering Management.

Brandinu, Gianluca; Trautmann, Norbert (2012). Sequential selection and heuristic scheduling of multiple resource-constrained projects. In: Demeulemeester, Erik; Herroelen, Willy (eds.) 13th International Conference on Project Management and Scheduling (pp. 102-105). Leuven: Katholike Universiteit

Trautmann, Norbert; Baumann, Philipp (2012). A hybrid approach to large-scale short-term scheduling in make-and-pack production (Unpublished). In: 4th International Conference on Information Systems, Logistics and Supply Chain. Québec. 26.08.-29.08.2012.

Trautmann, Norbert (2012). Heuristic decomposition and LP-based scheduling in make-and-pack production (Unpublished). In: 25th European Conference on Operational Research. Vilnius. 08.-11.07.2012.

Baumann, Philipp (2012). Planning of a continuous production process in the printing industry (Unpublished). In: 25th European Conference on Operational Research. Vilnius. 08.07.-11.07.2012.

Baumann, Philipp (2012). A hybrid approach to large-scale short-term scheduling in make-and-pack production (Unpublished). In: Operational Research Peripatetic Postgraduate Program. Linz. 16.07.-20.07.2012.

Trautmann, Norbert (2012). An application of combinatorial optimization in the printing industry (Unpublished). In: International Colloquium on Graphs and Optimization 201. Leukerbad. 13.-17.8.2012.

Trautmann, Norbert (2012). A hybrid approach to large-scale short-term scheduling in make-and-pack production (Unpublished). In: 10th seminar on scheduling computer and manufacturing processes. Frejus. 21.10.-27.10.2012.

Trautmann, Norbert (2012). A serial scheme for resource-constrained scheduling within Microsoft Project 2010 (Unpublished). In: 23rd Annual POMS Conference. Chicago. 20.-23.04.2012.

Trautmann, Norbert (2012). Applying the evolutionary solver of Microsoft Excel to scheduling problems (Unpublished). In: INFORMS International Conference. Beijing. 24.-27.06.2012.

Trautmann, Norbert (2012). An integer-programming approach to benefit-maximal selection and scheduling of resource-constrained projects. In: IEEE International Conference on Industrial Engineering and Engineering Management. Hong Kong. 10.12.-13.12.2012.

Baumann, Philipp (2012). Operations scheduling in make-and-pack production: schedule construction and GA-based priority-rule generation procedures. In: IEEE International Conference on Industrial Engineering and Engineering Management. Hong Kong. 10.12.-13.12.2012.

Baumann, Philipp (2012). Planning of a continuous production process in the printing industry (Unpublished). In: Workshop on large-scale optimization. Vevey. 21.11.-22.11.2012.

Baumann, Philipp (2012). A priority-rule based genetic algorithm for large-scale short-term scheduling in make-and-pack production (Unpublished). In: 10th Joint Operations Research Days. Neuchâtel. 28.06.-29.06.2012.

Baumann, Philipp (2012). A hybrid approach to large-scale short-term scheduling in make-and-pack production (Unpublished). In: INFORMS International Conference. Beijing. 24.06.-27.06.2012.

Baumann, Philipp (2012). Large-scale short-term scheduling in make-and-pack production: case study and GA-based approach (Unpublished). In: 23rd Annual POMS Conference. Chicago. 20.04.-23.04.2012.

Brandinu, Gianluca (2012). Sequential selection and heuristic scheduling of multiple resource-constrained projects (Unpublished). In: 13th International Conference on Project Management and Scheduling. Leuven. 01.04.-04.04.2012.

Baumann, Philipp (2012). Heuristic decomposition and LP-based scheduling in make-and-pack production (Unpublished). In: Programme doctoral en recherche opérationnelle. Zinal. 15.01.-19.01.2012.

2011

Trautmann, Norbert (December 2011). A serial scheme for minimizing the duration of resource-constrained projects within Microsoft Project (Unpublished). In: IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 06.12.-09.12.2011.

Baumann, Philipp (December 2011). Heuristic decomposition and LP-based scheduling in make-and-pack production. In: IEEE International Conference on Industrial Engineering and Engineering Management. Singapore. 06.12.-09.12 2011.

Trautmann, Norbert (October 2011). Scheduling in service systems: an application in the event-tourism industry. In: 41th International Conference on Computers & Industrial Engineering. Los Angeles. 23.10-26.10 2011.

Baumann, Philipp (September 2011). A continuous-time MILP-approach to short-term scheduling of make-and-pack production processes (Unpublished). In: Operations Research 2011. Zurich. 30.08-02.09. 2011.

Brandinu, Gianluca (September 2011). A scheduling application in the event-tourism industry: MILP model and experimental performance analysis (Unpublished). In: Operations Research 2011. Zurich. 30.08.-02.09. 2011.

Baumann, Philipp (August 2011). Minimizing changeover times of a make-and-pack production process: model and case study (Unpublished). In: 5th Multidisciplinary International Scheduling Conference : Theory and Applications. Phoenix. 09.08.-12.08 2011.

Brandinu, Gianluca (August 2011). An MILP-Approach to the optimization of event-bus schedules: a scheduling application in the tourism sector (Unpublished). In: 5th Multidisciplinary International Scheduling Conference: Theory and Applications. Phoenix. 09.-12.08 2011.

Trautmann, Norbert (August 2011). Decomposition approaches for multi-stage multi-product batch-production scheduling: a refined batching model (Unpublished). In: Multidisciplinary International Conference on Scheduling: Theory and Applications. Phoenix. 09.08.-12.08.2011.

Baumann, Philipp (July 2011). Portfolio-selection models for small investors (Unpublished). In: 19th Triennial Conference of the International Federation of Operational Research Societies. Melbourne. 10.07.-15.07.2011.

Brandinu, Gianluca (July 2011). Optimization of bus schedules in event tourism using mixed-integer linear programming (Unpublished). In: 19th Triennial Conference of the International Federation of Operational Research Societies. Melbourne. 10.07.-15.07.2011.

Trautmann, Norbert (July 2011). A heuristic procedure for resource-constrained project scheduling within Microsoft Project (Unpublished). In: 19th Triennial Conference of the International Federation of Operational Research Societies. Melbourne. 10.07.-15.07.2011.

Baumann, Philipp (May 2011). A continuous-time MILP approach to short-term scheduling of an industrial make-and-pack production process (Unpublished). In: Ninth Joint Operations Research Days. Bern. 12.05.-13.05.2011.

Brandinu, Gianluca (May 2011). A two-step heuristic procedure for resource-constrained project scheduling within microsoft project (Unpublished). In: Ninth Joint Operations Research Days. Bern. 12.05.-13.05.2011.

Trautmann, Norbert; Baumann, Philipp; Saner, Nadine; Schäfer, Tobias (2011). Batch sizing in multi-stage, multi-product batch production systems. In: Pistikopoulos, E.; Georgiadis, M.; Kokossis, A. (eds.) 21st European Symposium on Computer Aided Process Engineering (pp. 905-909). Amsterdam: Elsevier

Trautmann, Norbert; Baumann, Philipp; Saner, Nadine; Schäfer, Tobias (2011). A continuous-time MILP to compute schedules with minimum changeover times for a make-and-pack production. In: Pistikopoulos, E.; Georgiadis, M.; Kokossis, A. (eds.) 21st European Symposium on Computer Aided Process Engineering (pp. 1060-1064). Amsterdam: Elsevier

Baumann, Philipp; Trautmann, Norbert (2011). Heuristic decomposition and LP-based scheduling in make-and-pack production. In: Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (pp. 362-366). IEEE 10.1109/IEEM.2011.6117939

Trautmann, Norbert; Brandinu, Gianluca (2011). A Serial Scheme for Minimizing the Duration of Resource-Constrained Projects within Microsoft Project. In: Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (pp. 893-897). IEEE 10.1109/IEEM.2011.6118045

Trautmann, Norbert; Brandinu, Gianluca (2011). Scheduling in service systems: an application in the event-tourism industry. In: Proceedings of the 41st International Conference on Computers and Industrial Engineering. Los Angeles. 23.10.-26.10.2011.

Baumann, Philipp; Trautmann, Norbert (2011). Minimizing changeover times of a make-and-pack production process: model and case study. In: Fowler, J.; Kendall, G.; McCollum, B. (eds.) Proceedings of the 5th Multidisciplinary International Conference on Scheduling: Theory and Application MISTA 2011. Phoenix, Arizona, USA. 09.08.-11.08.2011.

Brandinu, Gianluca; Trautmann, Norbert (2011). An MILP-Approach to the optimization of event-bus schedules: a scheduling application in the tourism sector. In: Fowler, J.; Kendall, G.; McCollum, B. (eds.) Proceedings of the 5th Multidisciplinary International Conference on Scheduling: Theory and Application MISTA 2011. Phoenix, Arizona, USA. 09.-11.08.2011.

Trautmann, Norbert; Baumann, Philipp; Saner, Nadine; Schäfer, Tobias (2011). Decomposition approaches for multi-stage multi-product batch-production scheduling: a refined batching model. In: Fowler, J.; Kendall, G.; McCollum, B. (eds.) Proceedings of the 5th Multidisciplinary International Conference on Scheduling: Theory and Application MISTA 2011. Phoenix, Arizona, USA. 09.08.-11.08.2011.

Trautmann, Norbert (2011). Portfolio selection models for small investors (Unpublished). In: Operations Research 2011. Zurich. 30.08.-02.09.2011.

Baumann, Philipp (2011). A continuous-time MILP to compute schedules with minimum changeover times for a make-and-pack production (Unpublished). In: 21st European Symposium on Computer Aided Process Engineering. Chalkidiki. 29.05.-01.06.2011.

Trautmann, Norbert (2011). Batch sizing in multi-stage, multi-product batch production systems (Unpublished). In: 21st European Symposium on Computer Aided Process Engineering. Chalkidiki. 29.05.-01.06.2011.

2010

Fündeling, Cord-Ulrich; Trautmann, Norbert (2010). A priority-rule method for project scheduling with work-content constraints. European journal of operational research, 203(3), pp. 568-574. Amsterdam: Elsevier 10.1016/j.ejor.2009.09.019

Baumann, Philipp; Trautmann, Norbert; Zimmermann, Adrian (2010). An implementation of the iterative forward/backward scheduling technique in Microsoft Project. 12th International Conference on Project Management and Scheduling, Tours, April 26-28, 2010.

Trautmann, Norbert; Baumann, Philipp (2010). An iterative forward/backward scheduling method to improve resource allocation in Microsoft Project. ALIO-INFORMS Joint International Meeting, Buenos Aires, June 6-9, 2010.

Trautmann, Norbert; Baumann, Philipp (2010). A bidirectional schedule-improvement procedure for Microsoft Project. 40th International Conference on Computers and Industrial Engineering, Awaji, July 25-28, 2010.

Trautmann, Norbert; Baumann, Philipp (2010). Heuristic improvement of Microsoft Project's resource-allocation capabilities. EURO XXIV Conference on Operational Research, Lissabon, July 11-14, 2010.

Trautmann, Norbert; Baumann, Philipp (2010). An iterative backward/forward technique for the scheduling of resource-constrained projects within Microsoft Project. IEEE International Conference on Industrial Engineering and Engineering Management, Macau, December 7-10, 2010.

Trautmann, Norbert; Baumann, Philipp (2010). An MILP approach to short-term scheduling of an industrial make-and-pack production facility with batch splitting and quality release times. IEEE International Conference on Industrial Engineering and Engineering Management, Macau, December 7-10, 2010.

Brandinu, Gianluca (2010). Scheduling event-bus tours. Eighth Joint Operations Research Days, September 9-10, 2010.

Baumann, Philipp (2010). Portfolio-selection models for small investors. Eighth Joint Operations Research Days, September 9-10, 2010.

Baumann, Philipp; Trautmann, Norbert; Zimmermann, Adrian (2010). An implementation of the iterative forward/backward scheduling technique in Microsoft Project. In: 12th International Conference on Project Management and Scheduling.

Trautmann, Norbert; Baumann, Philipp (2010). An iterative backward/forward technique for the scheduling of resource-constrained projects within Microsoft Project. In: Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management, Macau.

Baumann, Philipp; Trautmann, Norbert (2010). An MILP approach to short-term scheduling of an industrial make-and-pack production facility with batch splitting and quality release times. In: Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management, Macau.

Trautmann, Norbert; Baumann, Philipp (2010). A bidirectional schedule-improvement procedure for Microsoft Project. In: Proceedings of the 40th International Conference on Computers and Industrial Engineering, Awaji.

2009

Trautmann, Norbert; Baumann, Philipp (2009). Resource-constrained scheduling of a real project from the construction industry. A comparison of software packages for project management. In: Sun, Hongyi; Jiao, Roger; Xie, Min (eds.) Proceedings of the 2009 IEEE International Conference on Industrial Engineering and Engineering Management, Hong Kong 8.-11.12.2009 (pp. 628-632). New York: Institute of Electrical and Electronics Engineers IEEE 10.1109/IEEM.2009.5373255

Trautmann, Norbert; Baumann, Philipp (2009). Resource-allocation capabilities of commercial project management software. An experimental analysis. In: Kacem, Imed (ed.) Proceedings of the 39th International Conference on Computers and Industrial Engineering, Troyes 6.-9.7.2009 (pp. 1143-1148). New York: Institute of Electrical and Electronics Engineers IEEE 10.1109/ICCIE.2009.5223881

Trautmann, Norbert; Baumann, Philipp (2009). Project Scheduling with Precedence Constraints and Scarce Resources. An Experimental Analysis of Commercial Project Management Software. In: Fleischmann, Bernhard; Borgwardt, Karl Heinz; Klein, Robert; Tuma, Axel (eds.) Operations Research Proceedings 2008. Selected Papers of the Annual International Conference of the German Operations Research Society (GOR) University of Augsburg, September 3-5, 2008 (pp. 165-170). Heidelberg: Springer Verlag

Trautmann, Norbert; Schwindt, Christoph (2009). A cyclic approach to large-scale short-term planning in chemical batch production. Journal of scheduling, 12(6), pp. 595-606. Norwell, Mass.: Springer US; http://www.springer-ny.com 10.1007/s10951-009-0107-y

Trautmann, Norbert; Schwindt, Christoph; Mellentien, Christoph (2009). Ablaufplanung von Eventmarketing-Veranstaltungen in der Automobilindustrie am Beispiel der Werksabholung von Neuwagen. Wintertagung der Wissenschaftlichen Kommission Operations Research des Vereins der Hochschullehrer für Betriebswirtschaftslehre, Ingolstadt, 23.-24. Januar.

Trautmann, Norbert; Baumann, Philipp (2009). Resource-allocation capabilities of software packages for project management. Sitzung der Arbeitsgruppe Projektmanagement und -scheduling der GOR, infineon AG, München, 13. November.

2008

Schwindt, Christoph; Trautmann, Norbert (2008). Rolling ingots production scheduling. In: Artigues, C.; Demassey, S.; Néron, E. (eds.) Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications (pp. 257-266). London: ISTE Publishing Company

Trautmann, Norbert; Fink, Rafael; Sagebiel, Hanno; Schwindt, Christoph (2008). A decomposition approach to short-term scheduling of multi-purpose batch processes. In: Braunschweig, Bertrand; Joulia, Xavier (eds.) 18th European Symposium on Computer Aided Process Engineering. Computer-Aided Chemical Engineering: Vol. 25 (pp. 157-162). Amsterdam: Elsevier

Schwindt, Christoph; Trautmann, Norbert; Fink, Rafael (2008). Hierarchische Anlagenbelegungsplanung bei Chargenproduktion. PPS Management - Zeitschrift für Produktionsplanung und -steuerung, 13(2), pp. 35-38. Berlin: GITO-Verlag

Ballestín, Francisco; Trautmann, Norbert (2008). An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem. International journal of production research, 46(22), pp. 6231-6249. London: Taylor & Francis 10.1080/00207540701420560

2007

Trautmann, Norbert; Fündeling, Cord-Ulrich (2007). Supply chain management and advanced planning in the process industries. In: Waldmann, K.-H.; Stocker, U.M. (eds.) International Conference Operations Research Proceedings 2006, Karlsruhe (D), 6.-8.9.2006 (pp. 503-508). Heidelberg: Springer Verlag

Trautmann, Norbert; Fink, Rafael; Sagebiel, Hanno; Schwindt, Christoph (2007). A MIP/RCPSP decomposition approach to short-term planning in chemical batch production with non-identical parallel processing units. In: Helander, Martin; Xie, Min; Jiao, Roger; Tan, Kay Chuan (eds.) Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2.-4.12.2007 (pp. 1342-1346). New York: Institute of Electrical and Electronics Engineers IEEE 10.1109/IEEM.2007.4419411

Schwindt, Christoph; Fink, Rafael; Trautmann, Norbert (2007). A priority-rule based method for scheduling in chemical batch production. In: Helander, Martin; Xie, Min; Jiao, Roger; Tan, Kay Chuan (eds.) Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2.-4.12.2007 (pp. 1347-1351). New York: Institute of Electrical and Electronics Engineers IEEE 10.1109/IEEM.2007.4419412

Trautmann, Norbert; Schwindt, Christoph (2007). Large-scale short-term planning in chemical batch production. In: Baptiste, Philippe; Kendall, Graham; Munier-Kordon, Alix; Sourd, Francis (eds.) Proceedings of the 3rd Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), Paris, 28.-31.8.2007 (pp. 490-497). Multidisciplinary Interernational Scheduling Conference. Theory & Application

Fündeling, Cord-Ulrich; Trautmann, Norbert (2007). Belegungsplanung einer Make&Pack-Anlage mit kontinuierlicher Prozessführung: Problemstellung und Fallstudie. In: Günther, Hans-Otto; Mattfeld, Dirk; Suhl, Leena (eds.) Supply Network and Logistics Management, St. Leon-Rot (D), 2.-3.2.2007 (pp. 301-320). Heidelberg: Springer Verlag

Trautmann, Norbert (2007). Eine Anwendung der Projektplanung im Event-Marketing, Institut für Wirtschaftswissenschaft, Technische Universität Clausthal (D), 20.3.2007.

Trautmann, Norbert (2007). Planning and scheduling of make-and-pack plants: 1. problem and industrial examples, EURO XXII Conference on Operational Research, Prag (CZ), 8.-11.7.2007.

2006

Morlock, Martin; Schwindt, Christoph; Trautmann, Norbert; Zimmermann, Jürgen (2006). Overview of Klaus Neumann's Research. In: Morlock, Martin; Schwindt, Christoph; Trautmann, Norbert; Zimmermann, Jürgen (eds.) Perspectives on Operations Research. Essays in honor of Klaus Neumann. Gabler Edition Wissenschaft (pp. 1-13). Wiesbaden: DUV

Schwindt, Christoph; Trautmann, Norbert (2006). A cyclic approach to large-scale short-term planning of multipurpose batch plants. In: Morlock, Martin; Schwindt, Christoph; Trautmann, Norbert; Zimmermann, Jürgen (eds.) Perspectives on operations research. Essays in honor of Klaus Neumann (pp. 225-237). Wiesbaden: DUV

Trautmann, Norbert; Ballestin, Francisco (2006). A metaheuristic approach for the resource-constrained weighted earliness-tardiness project scheduling problem. In: Proceedings of the Tenth International Workshop on Project Management and Scheduling, Posnan, 26.-28.4.2006 (pp. 56-62). Pozna: Institute of Computing Science, Pozna University of Technology

Fündeling, Cord-Ulrich; Trautmann, Norbert (2006). Scheduling of make and pack plants: a case study. In: Marquardt, Wolfgang; Pantelides, Costas (eds.) 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering, Garmisch-Partenkirchen (D), 9.-13.7.2006 (pp. 1551-1556). Amsterdam: Elsevier

Trautmann, Norbert; Herrmann, Sascha; Schwindt, Christoph (2006). Planning and scheduling of multipurpose continuous plants. In: Marquardt, Wolfgang; Pantelides, Costas (eds.) 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering, Garmisch-Partenkirchen (D), 9.-13.7.2006. Computer Aided Chemical Engineering: Vol. 21A (pp. 2159-2164). Amsterdam: Elsevier

Trautmann, Norbert; Schwindt, Christoph (2006). Priority-rule based scheduling of chemical batch processes. In: Marquardt, Wolfgang; Pantelides, Costas (eds.) 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering, Garmisch-Partenkirchen (D), 9.-13.7.2006. Computer Aided Chemical Engineering (pp. 2165-2170). Amsterdam: Elsevier

Trautmann, Norbert; Schwindt, Christoph (2006). A heuristic method for large-scale batch scheduling in the process industries. In: Haasis, Hans-Dietrich; Kopfer, Herbert; Schönberger, Jörn (eds.) Operations research proceedings 2005. Selected papers of the annual International Conference of the German Operations Research Society (GOR), Bremen, September 7-9, 2005 (pp. 155-160). Heidelberg: Springer Verlag

Morlock, Martin; Schwindt, Christoph; Trautmann, Norbert; Zimmermann, Jürgen (eds.) (2006). Perspectives on Operations Research. Gabler Edition Wissenschaft. Wiesbaden: DUV

Trautmann, Norbert; Herrmann, Sascha; Schwindt, Christoph (2006). A heuristic decomposition method for the short-term planning of continuous plants. In: Proceedings of the Tenth International Workshop on Project Management and Scheduling, Posnan, 26.-28.4.2006 (pp. 313-318). Pozna: Institute of Computing Science, Pozna University of Technology

Trautmann, Norbert (2006). A cyclic approach to large-scale short-term planning of multipurpose batch plants, EURO XXI Conference on Operational Research, Reykjavik (IS), 2.-5.7.2006.

2005

Fündeling, Cord-Ulrich; Trautmann, Norbert (2005). Belegungsplanung einer Make&Pack-Anlage: eine Fallstudie aus der Konsumgüterindustrie. In: Günther, Hans-Otto; Mattfeld, Dirk C.; Suhl, Leena (eds.) Supply Chain Management und Logistik. Optimierung, Simulation, Decision Support (pp. 223-233). Heidelberg: Physica-Verlag HD 10.1007/3-7908-1625-6_10

Trautmann, Norbert; Schwindt, Christoph (2005). A MINLP/RCPSP decomposition approach for the short-term planning of batch production. Computer Aided Chemical Engineering, 20, pp. 1309-1314. Amsterdam: Elsevier 10.1016/S1570-7946(05)80060-4

Neumann, Klaus; Schwindt, Christoph; Trautmann, Norbert (2005). Scheduling of continuous and discontinuous material flows with intermediate storage restrictions. European journal of operational research, 165(2), pp. 495-509. Elsevier 10.1016/j.ejor.2004.04.018

2004

Schwindt, Christoph; Trautmann, Norbert (2004). A priority-rule based method for batch production scheduling in the process industries. In: Ahr, D.; Fahrion, R.; Oswald, M.; Reinelt, G. (eds.) Operations Research Proceedings 2003 (pp. 111-118). Springer

Mellentien, Christoph; Schwindt, Christoph; Trautmann, Norbert (2004). Scheduling the factory pick-up of new cars. OR Spectrum, 26(4), pp. 579-601. Springer 10.1007/s00291-004-0174-6

Trautmann, Norbert (2004). A two-stage approach for batch production scheduling in the process industries. In: The 9th International Work­shop on Project Management and Scheduling. Nancy / France. 26.-28.04.2004.

2003

Schwindt, Christoph; Trautmann, Norbert (2003). Scheduling the production of rolling ingots: Industrial context, model, and solution method. International Transactions in Operational Research, 10(6), pp. 547-563. Blackwell 10.1111/1475-3995.00427

Schwindt, Christoph; Trautmann, Norbert (2003). Scheduling of rolling ingots production. In: Leopold-Wildburger, Ulrike; Rendl, Franz; Wascher, Gerhard (eds.) Operations Research Proceedings 2002 (pp. 83-88). Springer

Trautmann, Norbert (2003). Project scheduling with changeover times - schedule feasibility and network flows. In: Proceedings of the International Conference on Industrial Engineering and Production Management IEPM. Porto / Portugal. 26.-28.05.2003.

2002

Neumann, Klaus; Schwindt, Christoph; Trautmann, Norbert (2002). Advanced production scheduling for batch plants in process industries. OR Spectrum, 24(3), pp. 251-279. Springer 10.1007/s00291-002-0100-8

Schwindt, Christoph; Trautmann, Norbert (2002). Scheduling continuous material flows. In: Proceedings of the 18th International Conference on CAD/CAM, Robotics and Factories of the Future. Porto / Portugal. 03.-05.07.2002.

Schwindt, Christoph; Trautmann, Norbert (2002). Storage problems in batch scheduling. In: Chamoni, P.; Leisten, R.; Martin, A.; Minnemann, J.; Stadtler, H. (eds.) Operations Research Proceedings 2001 (pp. 213-218). Berlin: Springer

Trautmann, Norbert (2002). Anlagenbelegungsplanung in der Prozeßindustrie. In: Chamoni, P.; Leisten, R.; Martin, A.; Minnemann, J.; Stadtler, H. (eds.) Operations Research Proceedings 2001 (pp. 483-490). Springer

Trautmann, Norbert (2002). Internet-based exercises and mini-exams for production and operations management. In: Chamoni, P.; Leisten, R.; Martin, A.; Minnemann, J.; Stadtler, H. (eds.) Operations Research Proceedings 2001 (pp. 465-470). Berlin: Springer

Trautmann, Norbert (2002). Storage problems in process industries. In: 8th International Workshop on Project Management and Scheduling. Valencia / Spain. 02.-05.04.2002.

Trautmann, Norbert; Schwindt, Christoph (2002). Storage problems in process scheduling. In: Proceedings of the 18th International Conference on CAD/CAM, Robotics and Factories of the Future. Porto / Portugal. 03.-05.07.2002.

2001

Mellentien, Christoph; Trautmann, Norbert (2001). Resource allocation with project management software. OR Spektrum, 23(3), pp. 383-394. Springer 10.1007/PL00013358

Trautmann, Norbert (2001). Batch scheduling in process industries: solution procedures. In: Proceedings of the 17th International Conference on CAD/CAM, Robotics and Factories of the Future. Durban / South Africa. 10.-12.07.2001.

Trautmann, Norbert (2001). Calendars in project scheduling. In: Fleischmann, B.; Lasch, R.; Derigs, U.; Domschke, W.; Rieder, U. (eds.) Operations Research Proceedings 2000 (pp. 388-392). Springer

Trautmann, Norbert (2001). Components of advanced planning systems for process industries. In: Proceedings of the International Conference on Industrial Engineering and Production Management. Québec City. 20.-23.08.2001.

2000

Schwindt, Christoph; Trautmann, Norbert (2000). Batch scheduling in process industries: an application of resource-constrained project scheduling. OR Spektrum, 22(4), pp. 501-524. Springer 10.1007/s002910000042

Trautmann, Norbert (2000). Batch scheduling in process industries - an application of resource-constrained project scheduling. In: The 7th International Workshop on Project Management and Scheduling. University of Osnabrueck.

Trautmann, Norbert (2000). Process flow scheduling als ressourcenbeschränktes Projektplanungsproblem. In: Inderfurth, K.; Schwödiauer, G.; Domschke, W.; Juhnke, F.; Kleinschmidt, P.; Wascher, G. (eds.) Operations Research Proceedings 1999 (pp. 491-496). Berlin: Springer

This list was generated on Tue Mar 19 01:55:15 2024 CET.
Provide Feedback